Amount received through Indiegogo and direct payments on PayPal: 519 USD
Carretilla (Wheelbarrow): 50 USD
Manguera (Hose) (3/4 x 90 mts): 8,25 USD
Llave para manguera (Hose wrench): 0,30 USD
Cabillas estriadas (Treenails) (2): 7,6 USD
Cemento: 45 USD
Marco de segueta con hoja (Tail): 2 USD
Tubos cuadrados pulidos (Square tubes): 2,7 USD
Tubo PVC: 2,5 USD
Mandarria (porra): 8,33 USD
Piedra bruta (Stones) (5Mts³): 13,3 USD
Cabillas estriadas (Treenails) (10) de 3.4 mm x 12M: 125 USD
Cabillas estriadas (Treenails) (10) de 3.4 mm x 12M: 125 USD
Subtotal: $ 307,28
Fletes (Freight):
1 flete de piedra picada (Stones): 3 USD
5 fletes piedra bruta (Stones): 15 USD
2 fletes cauchos (Tires): 6 USD
Subtotal: $ 24
Mano de obra (replanteo) (Layout-Workforce): 26,6 USD
Mano de obra (muro de contención) (Retaining wall-Workforce): 25 USD
Total: 331,28
519-331,28= 187,72
519-331,28= 187,72
Remaining amount
$187,72
To be invested in:
Retaining wall: Freight of tires and Workforce
Freight of stones
Flattening of the ground (more space)
Strut and foundation (filling of cement)
Strut and foundation (filling of cement)